Get energy-efficient and low footprint heating systems with the support of Prime. Take advantage of a reliable source of heating with simple equipment upgrades that can fit in any space.

OUR COMMERCIAL AND INDUSTRIAL CLIENTS

5 SOLUTIONS FOR RELIABLE AND LOW FOOTPRINT HEATING

  1. Choose a field-assembled boiler.
  2. Install a boiler with an integrated economizer.
  3. Upgrade your combustion equipment.
  4. Benefit from dual-fuel energy.
  5. Maximize heating efficiency with steam traps.

CASE STUDIES

Year: 2015

What issue did the client have?
Needed replacement heating boilers that met condensing efficiency requirements that could also fit into the space as a replacement with ease.

Prime’s solution process:
A Miura LXW low water boiler solution with heat sponge condensing economizers.

How was the solution implemented?
Strong sales, estimating and engineering support to meet the client’s needs.

How did Prime surpass expectations?
Provided engineering support, Miura and CBW high quality products, after sales support and continued service support.

Year: 2020

Type of project/industry: Boiler replacement designed for healthcare linen.

Client’s pain point: Had old 1965 fire tube steam boiler, inefficient and requiring high level of operating engineer supervision.

  • Prime’s solution process
  • Prime proposed 2 x 100hp Miura high efficiency compact steam boilers, with Canon Boiler Works condensing economizers.

How was the solution implemented?
Prime worked with the two valued manufacturers (Miura & Cannon Boiler Works) to create an equipment solution by pairing the two technologies for maximum optimization.

How did Prime surpass expectations?
Ecotex did not know we had recently partnered with Cannon Boiler Works and they were previously interested in their products. Prime was able to use its knowledge of both companies’ products to make an effective pairing and be a sole source supplier to Ecotex for their needs.

Client appreciation:
“Having a valued partner like Prime Boiler allows us to concentrate on satisfying our customers with our services well into the future,”
Dan Steele, Director of Corporate Engineering – Ecotex Healthcare Laundry Services.

Year: 2012

What issue did the client have? Needed replacement heating boilers that would meet efficiency requirements and fit into the space as a replacement with ease.

Prime’s solution process: A Miura LXW low water boiler solution with Cannon Boiler Works condensing economizers.

How was the solution implemented? Strong sales, estimating and engineering support to meet the client’s needs.

How did Prime surpass expectations? Provided design and engineering support, Miura and CBW high quality products, after sales support and continued service support.

Year: 2021

What issue did the client have? The boiler’s heat exchanger that supplies the change rooms with hot water failed. A pinhole leak was identified while preforming annual maintenance.

Prime’s solution process: Prime isolated the boiler to prevent property damage and ordered a replacement.

How was the solution implemented? Prime installed the new boiler over 2 days. It required changes to the venting, gas line, electrical, and inlet/outlet piping.

How did Prime surpass expectations? The job was conducted in record time and hot water was restored to the locker rooms.

Client appreciation: Client was very happy and noted how the last company to replace a boiler required a factory rep to come preform the start-up. We were able to provide the start-up on same day.

An integrated economizer can yield 5% extra energy savings. Have you estimated the impact on your operating costs?